Friday, August 01, 2008

I was going to say

I was going to write this post about how we finally chose the family room colors together. How there's a beautiful blue above the picture rail. We painted all the wood trim too. And today we were fondly calling "Operation Gobi Desert." The color for the main part of the wall is called Gobi Desert. All that was going to happen.

Then Dan inspected the stain in the ceiling that kept coming through the primer. The stain was wet. Turns out that the T-joint in the plumbing to the vanity in the bathroom was s-l-0-w-l-y dripping down onto the ceiling and that's why the stain kept coming through. Dan went to work trying to fix the darn thing without having to completely rip everything to shreds. He was hoping to salvage some of Operation Gobi Desert. Then Lowe's was out of stock for the part he needed. Then the Home Depot apparently didn't even carry that part. We were forced to abort the mission.

At 6 PM he found the part he needed to fix the leak.

Tomorrow will be Operation Gobi Desert.

And Operation Bath time. (We were both skipped yesterday and were planning on this morning before the leak happened.)

No comments: